What goes into a block retaining wall in Roswell?
A block retaining wall in Roswell is a stack of concrete wall units set on a compacted stone base below grade, with drainage stone, filter fabric, and a perforated pipe behind it, and geogrid layers tied back into the slope on taller walls. The block you see is the smallest part of the job.
We cut the slope back, build the base, lay and level the first course, and bring the wall up course by course, compacting the backfill in layers as we go. Done that way, a block wall shrugs off years of Georgia rain.



Why is segmental block the usual choice on Roswell slopes?
Roswell yards tend to be sloped, the soil is clay, and many lots have more grade change than the builder dealt with. Segmental block fits that well.
- It flexes. Dry-stacked units can move a little with the ground without cracking, unlike a rigid poured or mortared wall.
- It drains. Joints and a stone zone behind the block let water out instead of building pressure.
- It scales. The same system builds a 2-foot garden wall or, with an engineer's design and geogrid, a tall terrace.
- It repairs. If a section is damaged, it can be taken apart and relaid. Try that with a poured wall.
- It curves and steps. Tapered units follow the yard, and steps can be built in. See walls with steps.
How do we build a block wall that lasts?
We dig a trench below grade, compact the subgrade, and build a level base of crushed stone, compacted in lifts. The first course goes in buried, dead level, and checked again and again. Every mistake in the first course shows up higher in the wall.
Behind the block goes clean drainage stone, a perforated pipe at the base that runs to daylight, and filter fabric between the stone and the clay so fines do not clog it. Hollow block cores get filled with stone too. Details are on the drainage page.
On taller walls, sheets of geogrid are laid between courses and run back into compacted backfill. The grid ties a block of soil to the wall so they act together. Length and spacing come from the design, not from guesswork.
Caps are glued down with a masonry adhesive made for the purpose. They finish the wall, shed water off the top, and keep the top course tight.


What sizes of block wall do we build?
| Garden and planter walls | Low walls around beds, pools, and patios. Small units, simple base, quick to build. Drainage still matters if soil sits behind them. |
|---|---|
| Yard walls up to 4 feet | The most common job: flattening a backyard or holding a slope beside a driveway. Built with a full base, stone, and pipe. |
| Walls over 4 feet | Designed by an engineer under Roswell's permit checklist, usually with geogrid. Often split into two terraced walls. |
| Terraces | Two or more walls stepped up the slope with a planting shelf between them. Spacing between tiers affects whether the walls load each other, which the design addresses. |


Does a new block wall need a permit in Roswell?
Yes, if it is over 30 inches from the bottom of the foundation to the top, per the city's Code Enforcement Guide. Retaining walls are a permit type on the City of Roswell's combined residential building and land disturbance application. Walls greater than 4 feet from the bottom of the foundation to the top need a qualified engineer's design, with an engineer's wall design certification and an owner indemnification form submitted with the application.
If the project disturbs 5,000 square feet or more, Roswell's land disturbance permit application applies, and its checklist asks for retaining walls with top and bottom elevations on the site plan. We handle the filing as part of the job. The permit page has a section tool that shows where your wall falls.
Terraced block walls get extra scrutiny in Alpharetta, where two walls closer together than twice the lower wall's height, and over 4 feet combined, are treated as one wall for permits and engineering.
What should you plan above and below a new block wall?
The ground around a wall matters as much as the wall. Above it, the top of the backfill should be graded to carry water away from the face, and downspouts should never empty onto it. If you plan a fence, a patio, or a parking pad up there, tell us at the estimate, because posts and loads near the top change the design.
Below the wall, leave the toe alone. Digging a planting bed or a trench tight along the bottom course removes soil that helps hold the base in place. Set new beds out from the wall instead, and keep irrigation heads from spraying the face.
What are the steps to a new block wall?
Measure and mark
At the free estimate we measure the run, the grade change, and where water flows, and mark the wall line with you.
Design and file
For walls over 4 feet we bring in an engineer, then file the permit with the city.
Call 811 and cut
Utilities are located before we dig. Then we cut the slope and stage block and stone.
Base, courses, drainage
Base, first course, stone, pipe, fabric, and grid go in together as the wall rises.
Cap, grade, clean
Caps are set, backfill compacted and graded, and the site is cleaned up and walked with you.
